Re: Microstation Earthworks Rounding Error and Reading Error with Log Files

$
0
0

MicroStation V8i (SELECTseries 2) - Version 08.11.07.443

Bentley GEOPAK V8i (SLECTseries 2) 08.11.07.427

After creating the earthwork log file by processing cross section end areas I load the log file into earthworks to draw the mass balance. The input for running earthwork is the following:

XSECTION

Earthwork

tolerance = 0.001000

vertical search distance = 500.000000

xs dgn = C:\Users\toddhummel\Desktop\XSec_PRUS85.dgn

   Proposed Finish Grade

       soil type = Ground

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.250000

           type = line, line_string

           lvname = Ts Line

           lvname = Asph F Line

           lvname = Asph A Line

           lvname = Asph E Line

           lvname = Conc A Line

           lvname = Aggr A Line

           lc = 0

           wt = 2

           co = 1,65,81,85,162

   Proposed Undercut

       soil type = BlendedBase

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Aggr B Line

           lvname = Aggr F Line

           lvname = Aggr C Line

           lc = 0

           wt = 2

           co = 53,69,117,133

       Do not include in mass ordinate

   Proposed Undercut

       soil type = Topsoil

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = T_Tie

           lvname = Ts Bottom Line

           lc = 0

           wt = 2

           co = 3,130

       Do not include in mass ordinate

   Proposed Undercut

       soil type = Asphalt

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Asph B Line

           lvname =  Line

           lvname = Aggr A Line

           lvname = Aggr D Line

           lvname = Conc B Line

           lvname = Conc F Line

           lvname = Conc C Line

           lc = 0

           wt = 2

           co = 1,17,81-82,85,101,130,146

       Do not include in mass ordinate

   Existing Ground Line

       soil type = Ground

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Grnd Line Exst

           lvname = DTM Void Line Exst

           lc = 2,ByLevel

           wt = 2,ByLevel

           co = 6,ByLevel

   Existing Unsuitable Material

       soil type = Topsoil

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Ts Line Exst

   Existing Unsuitable Material

       soil type = ExistingAsphalt

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Asph Line Exst

   Existing Unsuitable Material

       soil type = ExistingAggregate

       roadway exc mult factor = 1.000000

       subsoil exc mult factor = 1.000000

       fill mult factor = 1.000000

           type = line, line_string

           lvname = Aggr Line Exst

   Excavation Limit

           type = line

           lvname = T_Tie

           lc = 0

           wt = 2

           co = 3

   Ignore Areas

      from 309+23.03 R 1 to 310+76.97 R 1

   Volume Adjustment

       station = 736265

       soil type = Ground

       Common Exc volume = 1896

   Volume Adjustment

       station = 736265

       soil type = Ground

       Fill volume = 1642

   Volume Adjustment

       station = 736265

       soil type = Topsoil

       Fill volume = 822

   Volume Adjustment

       station = 736265

       soil type = Topsoil

       Common Exc volume = 1147

   Volume Adjustment

       station = 739000

       soil type = Topsoil

       Fill volume = 732

   Volume Adjustment

       station = 739000

       soil type = Topsoil

       Common Exc volume = 1126

   Volume Adjustment

       station = 739000

       soil type = Ground

       Fill volume = 5202

   Volume Adjustment

       station = 739000

       soil type = Ground

       Common Exc volume = 646

   Volume Adjustment

       station = 742000

       soil type = Topsoil

       Fill volume = 2842

   Volume Adjustment

       station = 742000

       soil type = Topsoil

       Common Exc volume = 3689

   Volume Adjustment

       station = 742000

       soil type = Ground

       Common Exc volume = 30448

   Volume Adjustment

       station = 742000

       soil type = Ground

       Fill volume = 3075

   Volume Adjustment

       station = 753300

       soil type = Ground

       Fill volume = 1094

   Volume Adjustment

       station = 753300

       soil type = Topsoil

       Common Exc volume = 1646

   Volume Adjustment

       station = 753300

       soil type = Topsoil

       Fill volume = 940

   Volume Adjustment

       station = 753300

       soil type = Ground

       Common Exc volume = 4541

   Volume Adjustment

       station = 758800

       soil type = Ground

       Fill volume = 1499

   Volume Adjustment

       station = 758800

       soil type = Topsoil

       Fill volume = 833

   Volume Adjustment

       station = 758800

       soil type = Topsoil

       Common Exc volume = 1358

   Volume Adjustment

       station = 758800

       soil type = Ground

       Common Exc volume = 4470

   Volume Adjustment

       station = 764150

       soil type = Topsoil

       Common Exc volume = 5188

   Volume Adjustment

       station = 764150

       soil type = Ground

       Fill volume = 28804

   Volume Adjustment

       station = 764150

       soil type = Topsoil

       Fill volume = 3815

   Volume Adjustment

       station = 764150

       soil type = Ground

       Common Exc volume = 32518

   Volume Adjustment

       station = 769075

       soil type = Ground

       Fill volume = 27703

   Volume Adjustment

       station = 769075

       soil type = Topsoil

       Common Exc volume = 1200

   Volume Adjustment

       station = 769075

       soil type = Topsoil

       Fill volume = 1015

   Volume Adjustment

       station = 769075

       soil type = Ground

       Common Exc volume = 109918

   Volume Adjustment

       station = 769075

       soil type = Ground

       Fill volume = 25

   Volume Adjustment

       station = 769075

       soil type = Ground

       Common Exc volume = 11998

   Volume Adjustment

       station = 769075

       soil type = Topsoil

       Common Exc volume = 12744

   Volume Adjustment

       station = 769075

       soil type = Topsoil

       Fill volume = 10044

   Write Earthwork Shapes

       plot param

           lv = 1020300510

           lvname = Earthwork Shapes 1

           co = 1

           wt = 0

           lc = 0

           Stratify Shape Color

   combine common exc + subgrade exc + subsoil exc

   Calculate Only Between Excavation Limits

   End Area Decimal Places = 4

   Process Earthwork for Baseline = PRUS85

       job number = 001

       beg sta = 7330+00.00 R 1

       end sta = 7730+00.00 R 1


Viewing all articles
Browse latest Browse all 19084

Trending Articles