Yes, Alignment XYZ is the target type I was referring to. With the Alignment XYZ target, the point will go to wherever the alignment is, no matter what the point constraints were initially on the point. If the end condition disappears, that means it is failing to find the Alignment XYZ at that station. I would check to make sure the target horizontal and vertical alignment exist at this station of the alignment being used by the corridor.
↧