Quantcast
Channel: OpenRoads | OpenSite Forum - Recent Threads
Viewing all articles
Browse latest Browse all 19084

Roadway Designer Station Equation Error

$
0
0

I'm having an issue with snapping to stations from Roadway Designer.  My project has a station equation that shifts the centerline 5.75'.  When I snap to a station before the equation, Roadway Designer reports the same station as Geopak's plan view labeler.  After the equation, Roadway Designer reports a station that is 0.03' off of what Geopak reports for the same point.  We've not had this problem on other projects with station equations.  

Hopefully the pictures below will do a better job explaining what I'm talking about...

Thanks in advance!

Andrew


Viewing all articles
Browse latest Browse all 19084

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>