Hello,
I am new to Geopak V8i SS2.
The workflow I follow for drafting a surface profile is as follows:
- Draw and Annotate Profile: Application->Geopak->Road->Plans Preparation->Draw Profiles->select Dialog Profile Cell Control button->select chain and add select Place Profile Cell button. I go down the list of profiles that I have needing profile cells placed. Then in the Draw Profile dialog select the display Setting, Chain and add Surface Settings button to populate an existing surface in each profile cell.
I believe that is the correct workflow for a surface profile. However, I am not sure of the significance of the "Define" button in the Project Manager Dialog. If I select Define, select my chain under Plan View, then Profile View. I am not even sure why it is needed if I have already created my profiles as described above?