Re: Projected Vertical Alignment - No Solution Found
I don't have an answer to your question but you could test your theory by shortening the range of your profile to reduce the number of PVIs and see if it makes a difference.
View ArticleRe: Projected Vertical Alignment - No Solution Found
Thanks Neil! I had success on a smaller sample. I appreciate the help!
View ArticleCivil Cells are slowing down
Hi,I'm working on a design with a lot of civil cells about 25 at this moment and the speed of my drawing is terrible slowing down. For example when I change one radius it took about 1.10 minutes to...
View ArticleTerrain model at roundabout approach
Dear All,I am trying to create a terrain model using the curb return elements and roundabout pavement outer edge as boundary strings for attaching a surface template. What is the best way to do this?...
View ArticleRe: Civil Cells are slowing down
have a look at the cells, do they have fill or shading?Often civils use cells are taken from imported Autocad files and some people still shade instead of using fill.So a black dot might be a huge...
View ArticleRe: Civil Cells are slowing down
ChristiaanMost likely it is not the cells slowing things down it is the clipping of the various pieces of the cells against the corridors. What then happens is every time a change is made to the...
View ArticleRe: OpenRoads - Add sections and End Area Volumes
If you cut end area volumes at odd stations in this manner it would mess up the computations of the EAV results. This is because we would have to compute a ratio of difference between the cut section...
View ArticleRe: OpenRoads - Add sections and End Area Volumes
Thanks Chris, the custom option will do what I want.
View ArticleRe: Station Equation Annotation - Inroads SS2
Hi Daniel,Give this a try. Under File>Project Options>Abbreviations, set your EQNBK to “STA. L.B.” and your EQNAHD to “STA.” only. Under Geometry>Horizontal Curve Set>Stationing, when...
View ArticleRe: GEOPAK Survey SS3 - labeled vs. stored coordinates differ
The recommendation is set the Project Explorer>Civil Standards>Project Settings>Survey>Default Setting ,once you arrive to this folder(Default Settings) just right-click and go to...
View ArticleRe: GEOPAK Survey SS3 - labeled vs. stored coordinates differ
The recommendation is set the Project Explorer>Civil Standards>Project Settings>Survey>Default Setting ,once you arrive to this folder(Default Settings) just right-click and go to...
View ArticleGEOPAK SS3 - Draw Profiles command equivalent
In GEOPAK SS2 there is a Draw Profiles command that I used quite often to project either surveyed edge of pavement profiles or simply a profile cut X' LT or RT of CL. I could then refer to these...
View ArticleGEOPAK SS3 - Extract profile from corridor surface
In GEOPAK SS2 I could easily create a surface from a corridor and a tin file would be automatically generated. I could then extract a profile from this tin and draw it on a profile cell using the Draw...
View ArticleRe: GEOPAK SS3 - Extract profile from corridor surface
I found a video link (below) that explains the process of creating a terrain from a corridor. However, what used to happen with the click of the Create Surface button in SS2 now takes an eight minute...
View Article[MXV8i SS3] OpenRoads Technology Q&A
Dear OpenRoads Expert,I do have few questions regarding OpenRoads Technology specially for MXRoad user,Anyone that know the answer, please reply and provide the steps if possible,This issue may...
View ArticleRe: GEOPAK SS3 - Extract profile from corridor surface
Hi Josh,seems you and I are going in parallel with regard to our learning process... I was looking at this only today.I used the "Terrain > create Corridor Alternate Surfaces" to create the terrain...
View Articleopen roads corrupt corridor
Dear All,One of the corridors in the dgn file containing the corridors got corrupted and throws me out of the software if I try editing or deleting it. I am not sure what the problem is and what is the...
View ArticleMxROAD V8i-SS2 Fly Through
Back in November Simon Pegg showed how to produce a Flythrough. He mentioned the extra bits that you can insert into the flythrough such as lighting columns ,gullies etc. Can someone give me some...
View ArticleRe: Civil Cells are slowing down
At this moment I had placed 15 parking Civil cells and 5 T-intersections, Butt I need at least to place about 60 -70 civil cells.Thanks in advance.CP
View Article